Skip to content

Roofing cost calculator

Roofing material cost calculator

Enter the roof area (measure it by address or use the roof square footage calculator), choose your state, and compare material-only costs with a typical waste allowance.

24.0 squares
MaterialWasteMaterial costLifespan
Architectural shingles
Laminated dimensional asphalt shingles — the most common U.S. roof.
10% — 25–30 yrs
3-tab shingles
Flat single-layer asphalt shingles, lowest cost.
10% — 15–20 yrs
Impact-resistant shingles (Class 4)
Asphalt shingles rated for hail; may lower insurance premiums.
10% — 30–40 yrs
Standing seam metal (steel)
Painted 24-gauge steel panels with concealed clips.
14% — 40–70 yrs
Corrugated / R-panel metal
Exposed-fastener steel panels, common on barns and budget roofs.
13% — 25–40 yrs
Stone-coated steel
Steel panels with granule coating in shingle, shake or tile profiles.
13% — 40–70 yrs
Metal shingles
Interlocking steel or aluminum shingle-shaped panels.
12% — 40–60 yrs
Concrete tile
Heavy molded tiles; check framing for the added weight.
15% — 40–50 yrs
Clay tile
Fired clay barrel or flat tiles; very long life.
15% — 50–100 yrs
Cedar shingles
Sawn cedar shingles, smoother than shakes.
13% — 20–30 yrs
Natural slate
Quarried stone; heavy and very durable.
15% — 75–150 yrs
TPO membrane
Single-ply white membrane for flat and low-slope roofs.
10% — 20–30 yrs
Modified bitumen
Asphalt-based rolls, torch-down or self-adhered.
10% — 15–20 yrs
EPDM rubber
Single-ply rubber membrane for flat roofs.
10% — 25–30 yrs

Planning prices for materials only (no labor, tear-off, disposal, delivery or tax). Not a supplier quote. Prices as of 2026-10; state adjustment: BEA Regional Price Parities, Goods (U.S. = 100), 2024.

How the calculation works

Roof surface area ÷ 100 = roofing squares. Squares × (1 + waste %) = squares to order. Squares to order × price per square × your state’s price level = material cost. Waste depends on the material: about 10% for shingles on a simple roof, more for tile, slate and metal with many cuts.

Labor typically costs as much as or more than the materials, and tear-off, disposal, permits and tax are extra — ask local contractors for a full bid.